King Clam Complete
In September of 2014 our MQG chapter had Latifah Saafir come to teach a Glam Clam Workshop followed by an open sew for a total of 12hours non-stop (exhausting) fun. Thanks to the prep she had us do ahead of time and the fact that I had chosen the 12" template, I was able to finish the top by months end. Why it has taken over three years to quilt, bind and put on my bed I have no idea.I thought it would be amusing to compile a mosaic of all the times it made an appearance on my FAL goal list but after tracking down enough to fill the grid I decided my point was made and never actually got a formal count of how many times it rolled over. Most importantly 2017FALQ4 Goal was the last, whoop whoop!
![]() |
| Finally On My Bed December 2017 |
We recently had a cold spell so I just placed it on top of my X-Plus quilt and let it hang over.
| FMQ detail |
Keeping with the scrappy spirit of the quilt and because doing any FMQ controlled and repetitive is something that does not personally appeal to me as a process, I chose a bunch of different motifs inspired by the fabric or at whim.
| Handstitching Binding |
A Glance Back
![]() |
| September 2014 |
Three holders with outstretched arms on a windy day at the yacht harbor captured the flimsy before trimming the bottom edge.
![]() |
| Original Fabric Pull |
![]() |
| Pre-Workshop Prep |
![]() |
| Showing Off Progress At the Workshop |
![]() |
| Latifah and I mid-way Workshop 2014 |
Started: September 2014
Finished: December 2017
Size: 100" x 100"
Pieced by me on my Babylock Symphony, Aurifil 50wt
Quilted by me on my friends Handy Quilter, Glide thread
Batting: Bamboo


















































